[Immediate Discharge System 2] Installation Example: Wastewater from Research Facility Experiments
It was installed for the drainage of experimental wastewater in research facilities where quietness and space-saving are required.
A pharmaceutical manufacturer’s laboratory has newly moved into the building as a tenant, and numerous experimental devices have been installed. Due to the inability to achieve proper drainage gradients and the limited space within the laboratory, an immediate drainage system was installed for the experimental sink and fume hood. By placing it under the sink, we were able to secure space for researchers, and the quiet operation and low vibration were also appreciated, leading to customer satisfaction. For the drainage of the most critical equipment, a dual alternating operation system has been adopted.
- Company:橋本産業
- Price:Other